Various amp; amp; Tone Blue Two Beach Ladies Summer Colour 2016 Colours Bags Styles Ombre Collection Design Stone amp; Stone Summer Blue Two Bags Design Colours Styles 2016 amp; Colour Collection Beach Ladies Tone Various Ombre Tarry Research & Education Center

Project Status: COMPLETED

Construction Start: October 1987
Stone Colours Blue Colour Design Styles Bags Collection Tone 2016 Summer Beach Various amp; Ombre Ladies amp; Two
Completion: January 1990

Project Description & Statistics

The Tarry Building, located at 300 East Superior Street, within the McGaw Medical Center, on the Chicago Campus of Northwestern University, is an expansion of the existing facilities in the adjacent complex made up of the Montgomery Ward Memorial Building, the Morton Medical Research Building, and the Searle Medical Research Building. It was developed to provide research and education space for basic science, clinical research, teaching and support services.

The Tarry Research & Education Building, a 17-story high rise structure, is situated on a typically compact downtown site, approximately 105' x 148'. In addition to laboratories, offices and support facilities, the building includes the Chicago Campus loading dock, utility shafts to facilitate future upgrading of adjacent buildings, and underground connections to the Northwestern Memorial Hospital. The design team was challenged by limited floor-to-floor elevations which were required in order to accommodate inter-connection with the existing adjacent buildings.

Project Cost: ~$60,000,000

Project Team

Project Management

Gabor M. Zsolnay, Facilities Design and Construction

Tone Summer Design Various Ombre Colour Stone Beach amp; Styles amp; 2016 Two Blue Bags Collection Ladies Colours Architect, Engineers & Consultants

Perkins & Will (Chicago, IL), Lead Architect & Engineer
Earl Walls & Associates (San Diego, CA), Laboratory Planning
Wiss, Janney, Elstner Assoc. (Chicago, IL), Precast & Curtain wall

General Contractor

Schal Bovis, Inc. (Chicago, IL)